Reinforced nut 90

Reinforced nut 90

The coupling nut is reinforced for fixing the shields from the outside

Wire PNSV-1,2

Wire PNSV-1,2

Heating wire PNSV-1,2 with a steel core for heating monolithic concrete,

Retainer Cone

Retainer Cone

Locking cone to protect the formwork elements from the impact of concrete

Pipe P/E d-25 bay

Pipe P/E d-25 bay

Pressure pipes for the construction and reconstruction of external pipelines

Tube PVC d-25 perforated

PVC pipe d-25mm perforated

Pipe for installation that keeps the distance between the formwork panels and when installing columns and pylons

Tube concrete f 22/40 mm (1.25 m)

Tube concrete f 22/40 mm

Fiber-reinforced concrete tube for insertion into the formwork, which prevents the penetration of concrete to the tie screw during its pouring

S-5 universal light formwork oil

Oil for formwork С-5

Universal oil for protecting the formwork when pouring monolithic and precast reinforced concrete.

Zmazka for formwork (20L)

Lubricant for formwork 20L

Grease for molds and forms for the production of concrete products and use in monolithic construction.

Spring clip chiroz

Spring clip chiroz

The spring lock is installed on the reinforcement to ensure a horizontal connection between the formwork panels.

Reinforced spring clip CIROS

Reinforced clamp CIROS

Spring lock Chiroz on the armature to ensure horizontal connections between the formwork panels

Key CIROZA

Key CIROZA

A tool for tensioning the reinforcement when fixing the formwork panels with a spring clip chiroz, made of special steel

Enhanced key CIROZA

Enhanced key CIROZA

The clamping reinforced key for the spring clip chiroz for the tension of the reinforcement when fixing the formwork panels is made of special steel.